| Week | Date | Topic |
Notes |
| 1 |
Sept. 8 |
-
SE Lab and Project Overview
- Review the information on process roles required in projects.
Team Leaders are recruited by the instructor. Each team leader is provided with a brief description of a project. From this
description the team lead is to identify personnel from the class, by reviewing the resumes, needed to complete the project. The selection process is
a round-robin, hence each project lead should have a prioritize list of personnel with reasons for needing that person on the team (skills).
- Review effort tracking requirements.
-
Learning Portal
The majority of work submitted for this class, lecture and lab, will be to the
Learning Portal, http://web.cis.umassd.edu. You should register as a user if you
have not already done so. The Portal supports both individual work and sharing
of documents for teamwork. You should become familiar with the workings of
this software.
-
Concept Map
We will be completing a number of assignments using the concept map softare, IHMC CMap. For a gentle introduction
to concept maps and their creation, refer to the practice document we prepared.
For those wishing to install CMap software on their personal machines, we have downloadable archives available.
-
Complete Resumè and upload to Portal
You need to prepare a current resumè. The project leads in your lab section will
be reviewing resumès to determine staffing for project teams. The
resumè you complete should be uploaded to the Learning Portal. Once there the visibilty
should be set to your lab section (Monday is 48001, Wednesday is 48002, and Friday is 48003).
|
|
| 2 |
Sept. 15 |
-
Project Initiation
-
- Personnel selection process.
- Teams meet to organize.
- Team Leads email the instructor a list of project personnel.
|
|
| 3 |
Sept. 22 |
Team leads notify instructors of meeting location. Note you have two hours for organizaiton and planning, don't waste it! Instructors will make the rounds, checking on status and progress.
-
Teams should review the information in Portal to insure correctness: 1) insure the membership of each team is correct and 2) insure that
the process roles are correct. We attempted to place each person in the group for a particular process role.
Effort data should be collected and summarized by Planning Managers.
Problems with categorization should be discussed and clarified within the team.
Quality Managers should review material on
quality assurance and configuration management pursuant to completing the team's Quality Assurance
Plan.
Planning Managers have been given the expected completion date for requirements. Work accordingly.
QA should post the minutes of the team meetings in Portal. QA needs to have document standard for requirements ready, and process for requirements review. They also need the configuration management process in place so
the support manager can implement.
The instructors would like to meet with each team for fifteen minutes to discuss any issues or concerns.
|
Project Guidance
|
| 4 |
Sept. 29 |
Sample QA and Configuration plans were placed as resources in Portal for the QA group's review.
Teams meet to finalize approach to requirements and prepare requirements document.
Teams review the requirements review process prepared by QA.
|
|
| 5 |
Oct. 6 |
Requirements Review
|
|
| 6 |
Oct. 13 |
Design Review
- Game Manager
-
Web-Based Survey
- Image Retrieval
-
CIS Advising
|
|
| 7 |
Oct. 20 |
Teams meet. Continue to plan and work toward delivery on Nov. 5.
|
|
| 8 |
Oct. 27 |
Teams meet. Continue to plan and work toward delivery on Nov. 5.
|
|
| 9 |
Nov. 3 |
Teams meet with instructors.
- CIS Advising
-
Image Retrieval
- Game Manager
-
Web-Based Survey
|
|
| 10 |
Nov. 10 |
Thursday Schedule/No Lab |
|
| 11 |
Nov. 17 |
Project Demos
|
|
| 12 |
Dec. 1 |
Design Task
- CIS Advising
-
Web-Based Survey
|
|
| 13 |
Dec. 8 |
Design Task
-
Image Retrieval
-
Game Manager
|
|
| 14 |
Dec. 15 |
Project Demos - Demos given to the lab section.
-
Web-Based Survey
- Game Manager
-
CIS Advising
- Image Retrieval
|
|
|